Solar power plant 54 MW and battery 180 MW - ready investment project of solar power plant

⚡ Investment Project: Construction of a 54 MW Solar Power Plant with 180 MW Energy Storage System.
The investment project involves the construction of a 54 MW solar power plant (SPP) with a 180 MW battery energy storage system (BESS), presenting a high-yield opportunity in Ukraine’s renewable energy sector. Initiated by Infinity Energy Group, the project is fully prepared for implementation, including land acquisition, technical documentation, regulatory approvals, and a signed agreement for non-standard grid connection.
Technical Specifications & Infrastructure
- Solar Power Capacity: 54 MW — ensures stable electricity production using modern photovoltaic panels.
- Battery Storage System (BESS): 180 MW — allows excess energy accumulation and flexible dispatch into the grid, essential for balancing day-ahead market (DAM) operations.
- Land Plot: Over 90 hectares, legally designated for energy production use, leased for 49 years.
- Engineering Readiness: Urban planning conditions secured, grid connection technical terms obtained, and non-standard connection approved by the utility provider.
Economic Viability & Profitability
The project targets energy sales in the Day-Ahead Market (DAM), enabling revenue based on market prices and demand fluctuations. Thanks to the BESS, the facility can:
- Smooth out production and consumption variations.
- Sell energy during peak price intervals.
- Ensure reliability and predictability of supply.
Anticipated return on investment (ROI) exceeds industry averages, with a **payback period** among the shortest in comparable segments. High efficiency is achieved through strategic siting, advanced technology, and flexible participation in the energy market.
Environmental & Strategic Impact
Aligned with global trends in decarbonization and clean energy transition, the project supports:
- Reduction of CO₂ emissions.
- Decreased reliance on fossil fuels.
- Enhanced energy security for the region.
**Execution Readiness**
Infinity Energy Group has ensured full legal and technical alignment:
- All documentation audited by international experts.
- Financial model and business plan are prepared.
- Project complies with regulatory standards and is ready for licensing submission.
**Investment Appeal**
- **Low Risk** due to complete readiness and the developer’s proven track record.
- **High Liquidity** — potential for resale or attracting co-investors.
- **Market Flexibility** — eligible to operate in various energy market segments.
This is a rare opportunity for investors seeking to combine **financial return** with **environmental responsibility**. Once completed, the project will be a milestone in Ukraine’s green energy landscape, offering stable profits for years to come.
тел. +380 66 3378060
https://infinity-energy-group.com/
← back